Process · Six gates

The event date is fixed. The decisions should be too.

Scope, copy, quantities, proof approval, physical validation and the venue route are resolved in order before a production slot is confirmed.

Proof-led sequence

From visual direction to a packable, reviewable system.

Lead time begins after scope, commercial confirmation and written proof approval—not from the first moodboard or enquiry.

Map zones and quantities

List arrival, ceremony, reception, tables, guest gifting and exit, then attach the real object or copy requirement to each zone.

Confirm route and handling

Record venue opening, doors, lifts, stairs, floor, airflow, power position, loading window and who will install or collect each module.

Freeze content ownership

Name one approver for spellings, dates, numbers, languages, monogram and final quantities. References must be owned or supplied with permission.

Review two proof rounds

Approve copy first, then layout, geometry, material direction, dimensions and limitations. Structural changes after approval receive a new scope.

Validate and produce

Fragility, stability, low-voltage modules, fit and packing are physically checked against the approved concept before dispatch or setup.

Handoff with a pack plan

Reusable cases, setup order, care notes and replacement-part boundaries travel with the object system so venue and client teams share one reference.